Results Gallery

Measurable change in project cycle time

40 engagements across 18 industries. Each one states where the project stood before, and what changed.


Featured
  • Yogiji DigiManufacturing · Multi-Projects
    Before

    YD Group manufactures steel processing equipment for major steel producers expanding capacity. Each project involves designing, manufacturing, and assembling thousands of components, with execution cycles of 6-18 months.

    After

    Projects completed per month: Increased from 2.1 to 2.6 (+37.6%). Overall project cycle time: Reduced from 14.5 months to 10 months (+45%). Cleared backlogs in ordering & assembly, streamlining workflows. Reduced inventory levels and rework, cutting unnecessary costs.

    Read the case study
  • Jindal Steel Odisha (JSOL)Metal & Mining · Greenfield/Brownfield Expansion
    Before

    JSOL embarked on a transformative journey in 2021, unveiling an audacious ₹18000 Cr capital expenditure plan aimed at doubling the capacity of its Angul plant from 6 MTPA to 12 MTPA by FY'24. The projects included HSM, Slab Caster, RMHS, Oxygen plant, and Central Utility.

    After

    The project was completed in 29 months, a record in comparison to similar projects done elsewhere.

    Read the case study
  • Brahmani River Pellets (BRPL)Metal & Mining · Greenfield expansion
    Before

    A beneficiation plant upgradation project for HGMS facility's readiness.

    Status

    Engagement ongoing.

    Read the case study
  • ISGECManufacturing · Multi-Projects
    Before

    There were around 50-55 projects running in parallel in machine division.

    After

    ISGEC had a target of increasing project throughput by 25% in one year. The target was achieved.

    Read the case study
  • VIBGYOREducation · Real Estate
    Before

    VIBGYOR set a target of setting up 6 schools in 2019-20, against their usual 2-3 schools a year. Till June, progress was negligible and the general feeling was that none will come on time.

    After

    All 6 schools were delivered on time.

    Read the case study
  • Jindal RealtyReal Estate · Software Partner
    Before

    JRL is one of the leading real-estate developers in North India. In Sonipat, the projects included student hostels, Independent floors, villas and plots, community infrastructure etc. Shortage of precast material and various resources, conflicting priorities and unreliable projections were some of the challenges that caused delays in these projects.

    After

    Transparent visibility of the entire portfolio was established in 3 weeks. 96% of planned milestones were achieved. University hostel blocks were delivered in 4.5 months against 7 months achieved earlier.

    Read the case study
  • HyattHotel & Hospitality · Infrastructure & Construction
    Before

    The new hotel construction in Lucknow was running behind schedule. Realization helped Hyatt to plan and strategize for achieving their ambitious target.

    Status

    Engagement ongoing.

  • Vulcan Green, OmanMetal & Mining · Greenfield/Brownfield Expansion
    Before

    Upto $3 Bn of Greenfield 5MTPA integrated steel project with 1.4 KM jetty ongoing since 2023. First green hydrogen ready steel plant in Duqm Oman, one of the largest in the GCC.

    Status

    Engagement ongoing.

  • Tata SteelMetals & Mining · Shutdown & Maintenance
    After

    Boiler conversion time was reduced from 300-500 days to 120-160 days, achieving a 68% faster turnaround. The planned shutdown period decreased from 11 days to 8.8 days. Daily revenue generation increased from $2M to $4M.

    Read the case study
  • Trident GroupPaper & Textile · Real Estate
    Before

    A real estate project that demanded coordination among over 30 vendors and contractors, with significantly lagging procurement. Realization engaged with a target to complete the project in an aggressive timeline of 6 months.

    After

    Overall execution throughput was increased by 25%. Despite the additional hurdles posed by the COVID-19 pandemic, the project was successfully delivered on time.

    Read the case study
  • L&T Heavy Engineering DivisionManufacturing · Software Partner
    Before

    Over 2100 projects in the portfolio across 5 manufacturing locations. For the past 15 years, utilizing Critical Chain Project Management in conjunction with Realization's software for on-time delivery.

    After

    On-time delivery increased to 98%.

  • Century PlyPlywood · Greenfield/Brownfield Expansion
    Before

    MDF Plant in Hoshiarpur, and Laminate Plant in Kolkata.

    After

    The Greenfield MDF project in Hoshiarpur was running late; the project was delivered in 11 months against an aggressive target of 10 months. Brownfield Laminate expansion in Kolkata: previous baseline 18 months, target 11 months, completed in 13 months.

    Read the case study
  • Kalpataru Projects InternationalEPC Business · Software Partner
    Before

    2 EHV transmission line projects in Congo and Ukraine.

    After

    KPTL exceeded AOP targets by 30-40%. Empowered the KPTL team to set up a PMO for 4 additional projects in Egypt, Zambia, Uganda and Rwanda.

  • Cameroon Mining Action (CAMINA)Metal & Mining · Greenfield Expansion
    Before

    Greenfield iron ore mine at Kirbi, Cameroon, with re-development of existing port, beneficiation plant, and logistics infrastructure. Realization is engaged to analyse and plan for the shortest possible time to operationalize the mine and associated infrastructure.

    Status

    Engagement ongoing.


Every engagement

BusinessCementChemicalEPC BusinessEducationGovernmentHotel & HospitalityIT & SoftwareManufacturingMetal & MiningMetals & MiningPaper & TextilePharmaceuticalsPlywoodPowerReal EstateShipbuildingTextile

ClientIndustryWhat changed
Aarti IndustriesChemicalIn 3 years, including 6 months of lockdown and stoppages due to COVID, Aarti was able to deliver ₹2000 Cr worth of projects.
L&T ShipbuildingShipbuildingDelivered in a record time of 28 months (site execution: 23 months).
Dr. Reddy's LaboratoriesPharmaceuticalsGlobal Generics and PSAI filings increased from 85 in FY09 to 110 in FY10, a 45% improvement in throughput. Cycle time for full drug development reduced from 915 days to 563 days, 40% faster. Due-date performance improved from 20% to 80%.
BUIDCoGovernmentBUIDCo doubled the speed of work front generation for contractors. 70% work front generated in 18 months to enable execution of ₹520 Cr out of ₹730 Cr.
Vulcan International, South AfricaMetal & MiningFirst project was delivered in 260 days, against a projection of 340 days. Second project was delivered, with significantly more scope, in 135 days. Both shutdowns for tie-ins were completed on time.
SSWLManufacturingOrder backlog of 6 months cleared in 6 months. Throughput increased by 25%. On-time performance above 90%.
Vardhman Special SteelsMetals & MiningProject was completed on time (10 months) along with 2 major shutdowns of actual durations 12 and 8 days against a plan of 11 and 8 days.
Prism JohnsonCementRecovery of 2 months delay in the largest brownfield expansion.
Jai Raj IspatMetal & Mining0.5 MTPA integrated steel plant including blast furnace, SMS, sinter plant, and rolling mill as major packages. Management set ambitious goals to overcome setbacks, aiming for project completion within 6 months.
Shyam MetalicsMetal & MiningAn ambitious target to commission and commence production from a new sinter plant, crucial for feeding a new blast furnace. Major project challenges included delayed equipment ordering, execution drawings and resource shortages.
Vikram SolarPowerDespite the COVID impact, project speed increased and two projects were delivered on time despite missing the earlier intermediate milestones.
NTPC SolarPowerThe Kawash project was delivered on time and was the fastest among the entire portfolio.
Garden Reach Shipbuilders & EngineersShipbuildingSet up and handover of PMO to GRSE within one year as per plan. 15-20% improvement in cycle time for one of their projects was achieved within a year.
JMC ProjectsEPC BusinessJMC's invoicing to DMRC surpassed that of all other contractors, becoming the highest. 30% jump in cash flow within the first 4 months of execution.
WelspunTextileThe capacity expansion was accomplished in 30 months, the most rapid in the textile industry.
VedantaMetal & MiningThey had to take advantage of the lean period and complete their shutdown within a set timeframe. The target was achieved.
AmdocsIT & SoftwareRealization helped Amdocs come up with an optimal allocation mechanism to deliver 20% more projects with the same resources.
Kanoria Chemicals, EthiopiaTextileGreenfield project delivered in 13 months against a similar project previously delivered in 18 months.
Nakoda TextileTextileDelivered in 10 months, 3 months faster than industry standards.
Everest IndustryManufacturingThe project was delivered on time (11 months).
Satvik LogisticsBusinessConstruction of a logistics park including warehouses in 18 months. Realization strategized and set up the PMO to achieve this aggressive but achievable timeline.
PP Rolling MillsManufacturingHot rolling mill and TMT mill equipment manufacturing. PPRM partnered with Realization to achieve a year-on-year rise in throughput of around 70% by streamlining its internal processes.
Trident Group — cotton yarnTextile2 yarn plants were delivered in 16 months, against 1 similar plant delivered in 21 months previously.
BluePiIT & SoftwareBluePi is strategically transitioning from agile to CCPM methodology for IT projects. The aim is to deliver 20%-30% more projects with the same resources and reduce the actual cycle time of projects by 50%.
Vardhman FabricsTextileThe first project was delivered on time in 15 months with a 30% additional scope and the second project was delivered on time in 18 months.
KPTL — DomesticEPC BusinessKPTL exceeded AOP targets by 20-30%.

The range

Clients have reduced project cycle time by 25–50%. The figure depends on how much of the delay sits in execution rather than in scope, approvals or supply — which is the first thing an assessment establishes.

View all 42 case studies