Realization in Steel
Steel CAPEX, delivered on the committed date
Mills, expansions and commissioning projects where a month of overrun is measured in lost production, not in schedule variance.
Why steel projects slip
A steel expansion is a long-lead equipment problem wrapped around a civil programme, commissioned into a running plant. Three things follow.
Work fronts open before they are ready, because the commissioning date is fixed and starting looks like progress. Specialist commissioning resources are shared across several packages, so each package waits for one of them. And the dependency between civil, mechanical, electrical and instrumentation surfaces at the handover rather than before it.
None of that is a scheduling error. It is a decision about what gets released into execution, and how much runs at once.
Measured outcomes
In the steel sector
- Jindal Steel29 monthsworld record for a hot strip mill5.5 MTPA Hot Strip Mill commissioned.Read the case study
- Tata SteelFinishing millcycle time reductionDocumented in the case archive.Read the case study
- Vardhman Special SteelsExpansiondelivered to commitmentDocumented in the case archive.Read the case study
Also in the archive
Is a mill or expansion at risk?
Tell us about the project at risk of missing its committed date.