Part 2: The Case for Simplifying Project Management
Learn why project delays and coordination overload persist despite sophisticated tools, and how simpler execution systems improve project flow and delivery.
In Part 1, I argued that much of what passes for project management is really coordination and firefighting. Managers and experts who should be making technical, commercial, organizational, and stakeholder decisions are instead consumed by schedule reconciliation, resource priority fights, expediting, status meetings, and recovery from yesterday’s surprises.
This raises the obvious question: if coordination is the problem, why not solve it with better models, more powerful algorithms, and more sophisticated software?
That is the subject of this essay.
The myth of complexity
The standard explanation is that project management is difficult because projects are technically complex. They have many tasks, many dependencies, many resource types, many handoffs, and many uncertainties. As projects grow, the number of activities and relationships appears to explode. Therefore, the argument goes, we need more sophisticated planning tools, more detailed schedules, more powerful algorithms, and more elaborate software systems.
This belief has a respectable origin. Kelley and Walker were addressing precisely the difficulty of representing and coordinating the many activities involved in a large engineering project. Their solution was to make the technological relationships among tasks explicit through a project network: to separate planning from scheduling, identify the order in which activities must occur, and then use that structure to produce schedules.
But there is a hidden assumption in the way this history is often understood. The myth is that technical complexity automatically creates coordination complexity.
That sounds plausible. But it is not necessarily true. In fact, the relationship is often the opposite. The more clearly the structure of the project is defined, the less complex the coordination problem becomes.
To see why, consider a simple thought experiment.
Suppose there are three resources: R1, R2, and R3. There are also six tasks: T1 through T6. Assume first that all three resources are interchangeable. Any resource can do any task. Also assume that all six tasks are available, and that all tasks take the same amount of time.
In the first round, R1 has six choices. After R1 chooses, R2 has five. After R2 chooses, R3 has four. So the first round has 6 × 5 × 4 = 120 possible assignments. After those three tasks are completed, three remain: 3 × 2 × 1 = 6. Across both rounds, the total number of possible assignment sequences is 720.
At first, this seems to support the myth. More tasks and more resources appear to create a rapidly expanding coordination problem.
But now add structure. Assume the three resources are not interchangeable. R1 can do only T1a and T1b. R2 can do only T2a and T2b. R3 can do only T3a and T3b. In the first round, each resource has two choices: 2 × 2 × 2 = 8 possible assignments. After that, each resource has only one remaining task of its own type. The total is now 8.
The structure of the work has not increased the coordination problem. It has reduced it, from 720 possible assignment sequences to 8.
Now add technical dependencies. Suppose the tasks must be done in this sequence: T1a → T2a → T3a → T1b → T2b → T3b. Now the choices collapse completely. At the start, only T1a is available, so R1 does T1a. Then only T2a is available, and so on. The total number of possible assignment sequences has collapsed to 1.
This is the critical point: coordination complexity is not created by the total number of tasks in the project. It is created by the number of legitimate choices available at the point of execution.
Coordination complexity exists only when resources have choices — that is, when the number of executable tasks at a given moment exceeds the number of resources available to do them. If there is only one legitimate task available for a resource, there is no coordination decision. If there are no tasks available, that is a different problem: the resource is blocked, or the system has failed to make work ready.
The more clearly the technical structure is defined — dependencies, task types, resource types, sequence — the fewer legitimate choices remain. Technical structure does not necessarily increase coordination complexity. It often reduces it by eliminating false choices.
The problem arises when we treat the project as an undifferentiated pool of tasks competing for an undifferentiated pool of resources. In that abstraction, everything appears to compete with everything else. Every task seems potentially eligible. Every resource seems potentially assignable. Every priority seems negotiable.
But a real project is not an undifferentiated pool of work. It is a structured system of tasks, dependencies, resource types, technical sequences, readiness conditions, and constraints. The task of management is not to coordinate every possible choice. It is to design the system so that most choices are eliminated by structure.
The real source of coordination complexity
Even if the technical network is well defined, organizations still experience enormous coordination problems. The meetings continue. The expediting continues. The priority fights continue. Why?
The answer is that real project execution is not just a problem of choosing tasks for individual resources. It is a problem of synchronizing the choices of multiple resource groups in an environment of variability and uncertainty.
A project task is rarely performed by one resource acting alone. Even when one group appears to own the task, many other groups may be required to make it executable. Some provide external inputs: drawings, specifications, materials, approvals, customer decisions, or vendor responses. Some work in tandem: mechanical and electrical engineering together, operations and maintenance preparing an outage, construction and inspection side by side. Some provide enabling support: cranes, scaffolding, paperwork, test equipment, permits, access, or specialized tooling. Some solve problems when the task does not go as expected.
Each of these groups has its own queue of work, its own constraints, its own local priorities, and its own understanding of urgency. And because projects operate in an environment of variability, the right priority can change at the point of execution.
The problem is not merely that a resource must choose what to do next. The problem is that many resource groups must make compatible choices at the same time, in real time. If they do not, the project stalls. One group is ready while another is not. Inputs arrive too late. Support is scheduled for the wrong work. Experts are pulled into the wrong problems. Managers spend their day reconciling mismatched priorities.
That is the real coordination problem: synchronizing priority decisions across interdependent resource groups at the point of execution, under variability and uncertainty.
This also explains why technical activity networks, by themselves, do not solve the coordination problem. A network can show what should precede what. But it does not automatically ensure that every resource group, every day, makes the same priority decision when reality changes.
Why sophistication does not solve the problem
More sophisticated models and algorithms can represent more tasks, more relationships, more dates, more resource assumptions, and more scenarios. But sophistication first runs into the data problem: the data needed to run these models are often unavailable, unreliable, incomplete, or obsolete by the time decisions must be made.
Even if the data were available, the models would still not solve the synchronization problem at the point of execution. They can improve analysis, but they cannot ensure that multiple resource groups make the same priority decision in real time as conditions change. Worse, they can create the illusion that the project is under control simply because the model is detailed.
A detailed schedule can tell each group what it was supposed to do. It cannot ensure that every group makes the same priority decision when the plan collides with reality.
That collision is constant. Materials arrive late. Drawings change. Access is not available. A test fails. A vendor misses a commitment. The schedule may be updated, but the organization still has to answer the live question: what should we do now?
In many organizations, the answer is produced through coordination and firefighting. People meet, escalate, negotiate, expedite, re-prioritize, and chase. The result may eventually be a decision, but the cost is high. Management capacity is consumed. Expert capacity is consumed. And because the decision is often made late, under pressure, and with incomplete information, it may not be a good decision.
The simplicity principle
A simpler project management scheme should reduce both layers of coordination complexity.
First, it should nearly eliminate the number of consequential choices at the point of execution. Resources should not face a large pool of competing work every day. And if they do have competing choices, the choice should not have a material impact on project delivery.
Second, it should not require forced synchronization of the choices that remain. When a task requires multiple resource groups, those groups should not each have to continually make separate local priority decisions and then rely on meetings, escalation, or expediting to bring those decisions back into alignment.
This is the simplicity principle: eliminate consequential choices at the point of execution, and eliminate the need to constantly force synchronization across resource groups.
The goal is not to eliminate judgment. It is to move judgment to where it belongs. Management and expert judgment should be used for real management work: deciding which projects to pursue, what scope to commit to, what technical approach to take, what commercial tradeoffs to make, which risks are worth taking, and which capabilities must be developed. It should not be consumed by daily priority reconciliation, expediting, and firefighting.
The test of a project management system, therefore, is not how much detail it can contain. It is how much coordination it eliminates.
Conclusion
The great irony of modern project management is that it began as an attempt to relieve management from coordination overload. Kelley and Walker saw that when traditional planning failed, projects were left to coordinators and expediters. The Critical Path Method was created to make the structure of work visible and to help management understand where attention was truly needed.
Yet decades later, much of project management is still consumed by the very problem it was meant to solve. The tools have become more sophisticated, but the burden of coordination remains.
The reason is that the core problem has been misunderstood. Coordination complexity is not simply a function of technical complexity. The first problem is excess choice at the point of execution. The second, deeper problem is synchronizing those choices across interdependent resource groups under variability and uncertainty.
The answer is not to build ever more elaborate systems for coordinating every possible choice. The answer is to design a scheme that eliminates consequential choices at the point of execution and removes the need to constantly force synchronization across resource groups.
Project management does not need to become more sophisticated. It has to become way simpler.