How we can solve the late project problem?
Learn why projects run late and discover practical strategies to reduce delays, improve prioritization, manage resource constraints, and deliver projects on time.
Since the beginning of formal project management, projects have been suffering from time overruns, de-synchronization and lack of predictability. Even leaps in technology have not been able to counter this. What could be the reason for this inexplicable trend?
One of the usual external factors that almost every project has to deal with is resource shortages: mobilization gets delayed, required numbers are hardly ever available, scope additions and other delays increase requirement, management and expert capacities are unknown.
One of the obvious management reactions to shortages is prioritization. What was shown earlier is that prioritizing when facing a shortage has a wide range of unpredictable outcomes, and in most of them delays multiply and synchronization is lost — exactly the same symptoms that projects, as a whole, exhibit.
Only a very few of the prioritization decisions lead to vastly more efficient outcomes, but they follow no known rules and obey no known logic that we can possibly deploy.
The Critical Path method, as forewarned by its proponents 60 years ago, is ineffective too. Even the best plans go astray; even the best project management teams cannot fire-fight enough.
Without fixing this, how could we ever get projects under control, especially when resource shortages are so omnipresent in projects?
Why are we ignoring other uncertainties, some would argue? Uncertainties like estimation errors, day-to-day delays, changes in scope?
Believe it or not, they are far simpler factors to deal with. They cannot hurt predictability, because every such event has only a single, definite outcome. We can always plan and recover from future tasks.
If we have unlimited resources, these can be countered through textbook planning and control or sheer experience. Have you ever heard of a late project that had resources, including money, poured into it?
But when resources are limited or inadequate, these factors pile up on the chaos and amplify the impact.
The complexity of resource shortages
- It has no impact on individual tasks but generates invisible dependencies between tasks that are otherwise unrelated to each other in every conceivable way.
- Resource dependencies, unlike technical ones, can possibly run in any direction.
- Before prioritization has happened, it has many possibilities. Until someone prioritizes, we cannot know which one is going to be true.
These are the reasons why predictions tend to become so unreliable. Even the best planners cannot possibly model these possibilities in a plan — there are just too many. And they have no way of knowing how much shortage individual groups might be facing and how they are going to prioritize their work as a result.
Even if they did, remember, there are no known rules for good prioritization. It is not possible for anyone to know whether by prioritizing according to criticality, cash flow or risk, he or she is benefiting the project or causing more harm.
Even if one could put accurate values into a scheduling or optimization tool and run it, it is not possible to conclude whether the answer it churned out is a good answer or not.
These are important considerations to take note of before we castigate planners for poor planning and explain away project delays.
Are we then facing a dead end?
Thankfully, no. If we look at the nature of resource dependencies and how they affect projects, we can find a way to avoid most of the possible detrimental outcomes.
We cannot still claim that this is the best outcome for our projects, but we can definitely say with confidence that this is very near the best that can possibly happen.
And the quantum of improvement in terms of timeline alone is a lot — more than 20%. In addition, it ensures synchronization and makes predictions very reliable during execution.
The solution is also very simple. It only requires a change in the way we conceptualize projects.
How are good and bad solutions generated?
Resource shortages are not harmful on their own. They only generate many options, but the impact is constant. If there are 3 tasks A, B and C and only 1 available resource to execute them, then they can be executed in ABC, ACB, BAC, BCA, CAB or CBA sequences, but the time impact is constant: the sum of the durations of A, B and C.
However, in projects there exist integration points, and together they act as partners in crime. Together, they produce many possible outcomes.
Integration points are the places in projects where synchronization is necessary. The project team has to coordinate drawings, supplies, civil and fabrication to make sure piping can happen.
Now, if every stakeholder — engineering, supplier, civil, mechanical and piping — has enough capacity to support only one of two tasks, how could we execute this mini-project? If each of them considers what is critical for them individually and postpones what seems to have time, the result is predictable. Since each of the stakeholders can have 2 options, there are 16 possible solutions to this problem. Out of the 16, there are 14 bad solutions and only 2 good ones.
The key to finding the solution to on-time projects
When we try to execute any project, we can expect to face resource shortages. We just do not know where we might face them, when they might strike and what the quantum of the shortfall will be.
How then could we plan our projects, and what could be the mechanism for prioritization that would make them impervious to the bad possibilities, whenever we face the eventual reality?